What changed in 2026

Last checked: October 20, 2026 against the source documents. Based on: SCDES Fact Sheet for SCR100000 (pp.1-3) and the permit sections it points to; SCDES Construction Activities page.

The permit's cover page shows “Issued: February 27, 2026”, “Effective: March 30, 2026” and “Expires: March 29, 2031”. [CGP cover, p.1] SCDES's fact sheet says the permit “is set to become effective on March 30, 2026, and will expire on March 30, 2031”. [FS p.1]

This site uses the date printed on the permit itself, March 29, 2031. The fact sheet still reads as the draft-stage version; it says “SCDES's preliminary determination to re-authorize the applicants to discharge under the draft permit is open for public comment.” [FS p.3]

The list below follows the fact sheet's “Specific updates contained in the permit to highlight” [FS pp.2-3], with the matching permit text where we found it.

1. Electronic submission through ePermitting

The fact sheet lists “Updated physical copy submission to electronic submission via the online permitting portal, ePermitting.” [FS p.2] The permit says NOI submittals “will be made electronically through the Department's new software called ePermitting” [CGP 2.3, p.14], and NOTs are submitted via ePermitting too. [CGP 5.2.A, p.59; 5.3, p.59] SCDES's web page says: “As of May 5th, SCDES will no longer be accepting any paper applications for Construction Stormwater by mail or in-person.” [CA] SCDES's Construction Stormwater FAQ gives the year: “Beginning April 7, 2025, the ePermitting system will officially accept applications for construction stormwater. Recognizing the need for a smooth transition to the online platform, SCDES will allow a transitional period until May 5, 2025. After this date, all permit applications must be submitted exclusively through ePermitting.” [FAQ]

2. Certifier Agreement and identity verification

The fact sheet describes “the requirement for Primary Permittees to sign and submit a wet-ink Certifier Agreement prior to the submission of applications, or to complete the identity verification process online through ePermitting”. [FS p.2] The permit says “Applicants must verify their identity and certify their signatory authority prior to submitting applications through ePermitting” [CGP 2.3, p.14], and Section 2.5 says “Permittees must sign and mail a wet-ink copy of the Certifier Agreement” to: Certifier Agreement Administrator, South Carolina Department of Environmental Services, 2600 Bull St., Columbia, SC 29201. [CGP 2.5, p.20]

Unconfirmed, verify with SCDES: whether online identity verification replaces the wet-ink Certifier Agreement. The fact sheet says 'or'; permit Section 2.5 says permittees 'must sign and mail' the wet-ink copy.

3. Utility Blanket NOI replaces the Annual Blanket NOI

The fact sheet says the “Annual Blanket Notice of Intent (AB-NOI) has been changed to Utility Blanket Notice of Intent (UB-NOI) (Section 2.2.3.A) to allow for utilities to obtain coverage for the duration of this permit”. [FS p.2] The permit says the UB-NOI's coverage “will expire with the expiration of this permit” and “Renewal of each Utility Blanket NOI must be submitted prior to the expiration of this permit if coverage is still desired”. [CGP 2.2.3.A, p.13]

4. Other changes the fact sheet highlights

Covered under the previous permit?

The permit says: “If you previously received authorization to discharge for the current phase of your Project under the 2021 CGP, you shall be granted a continuation of coverage under this general permit. There will be no additional fees associated with a continuation of coverage”. [CGP 2.4.2.A, p.17] Ongoing projects stay covered “provided that the SWPPP was updated in accordance with provisions of the 2026 CGP and the original operator of the construction activities remains in control of implementation of the SWPPP”. [CGP 2.4.2.B, p.17] SCDES may ask a permittee to confirm their intent to be covered; if confirmation is requested and “not provided within 30 calendar days from the date of the written request, coverage under the new general permit will be terminated”. [CGP 2.4.2.A, p.17]

What is the "2021 CGP"? It is the previous issue of the same permit, SCR100000. Its cover page shows “Issued: January 29, 2021”, “Effective: March 1, 2021” and “Expires: February 28, 2026”. [CGP21 cover, p.1] SCDES still posts it as the “2021 Construction General Permit (CGP)”. [DA] In its Response to Comments, SCDES says the Section 2.4.2 language “has been updated to reference the previous iteration of the CGP (2021) as well as the most recent iteration, dated 2026.” [RTC 2.4.2.A, p.24] (Section 1.1 of the 2026 permit still says it replaces the permit “issued September 1, 2006 and October 15, 2012” [CGP 1.1, p.5]; the 2021 permit's Section 1.1 contains the same sentence. [CGP21 1.1] SCDES's All Forms page also still describes several forms as for “the new 2012 Stormwater NPDES General Permit”. [ALL])